LOGIN TO YOUR ACCOUNT

Username
Password
Remember Me
Or use your Academic/Social account:

CREATE AN ACCOUNT

Or use your Academic/Social account:

Congratulations!

You have just completed your registration at OpenAire.

Before you can login to the site, you will need to activate your account. An e-mail will be sent to you with the proper instructions.

Important!

Please note that this site is currently undergoing Beta testing.
Any new content you create is not guaranteed to be present to the final version of the site upon release.

Thank you for your patience,
OpenAire Dev Team.

Close This Message

CREATE AN ACCOUNT

Name:
Username:
Password:
Verify Password:
E-mail:
Verify E-mail:
*All Fields Are Required.
Please Verify You Are Human:
fbtwitterlinkedinvimeoflicker grey 14rssslideshare1
Name
Informes de la Construccion
Type
Journal
Items
5120 Publications
Compatibility
collected from a compatible aggregator
OAI-PMH
-

 

  • Edificio del Congreso Bad-Gastein – Austria

    Garstenauer, G. (1975)
    One of the most outstanding characteristics of this Congress Centre is its great adaptation to the hilly ground on which it is situated occupying a very small area and having successfully solved the problem of a difference of elevation of 50%. The entrance to the building is on the top floor, placed at the level of the street that limits the plot in its highest section. On this floor, which is covered by a transitable terrace, are the various offices and premises for the use of the cong...

    Armado Óptimo de Secciones de Hormigón Posteso

    García-Villena, F. A.; Carbonell-Márquez, J. F. (2014)
    The amount of passive reinforcement to be provided in the ultimate limit state is computed by means of RSD (Reinforcement Sizing Diagrams) taking into account the presence of active reinforcement, for a particular range of pairs active steel area – active steel eccentricity (Ap – dp) that meet the requirements imposed by the serviceability limit state. The solution that provides the minimum total cost of both active and passive steel is selected.Para un rango de valores de área de armadura ac...

    Residencia Scheimer - (EE. UU.)

    Neutra, Dion (1977)
    The Scheimer residence is the first one family dwelling built exclusively by Dion Neutra after the death of his father —and thirty- year work companion— Richard Neutra. In this home, concepts and ideas —already achieved by both coworkers— take shape with better levels of development. Basically, the design strives to, and does, materialize what Dion Neutra calls «a dynamic bond» between the interior space of the dwelling and the natural surroundings by appealing to an active participatio...

    Noticias

    Editorial, Equipo (1978)

    Instalación de almacenamiento de residuos radiactivos de El Cabril, en Hornachuelos, Córdoba-España

    Zuloaga Lalana, Pablo (1994)
    The Installation of El Cabril has the capacity for long-term disposal of low and medium radioactivity waste generated in Spain by 2010.<br /> The Installation consists of: <ul><li> Three already existing modules for temporary storage.</li><li> A disposal area with 28 reinforced concrete cells where waste is deposited after being introduced in concrete containers.</li><li> A building for Waste Conditioning of the waste coming from radioactive inst...
  • No data provider research data found
  • Latest Documents Timeline

    Chart is loading... It may take a bit of time. Please be patient and don't reload the page.

    Document Types

    Chart is loading... It may take a bit of time. Please be patient and don't reload the page.

    Funders in data provider publications

    Chart is loading... It may take a bit of time. Please be patient and don't reload the page.

    Projects with most Publications

    Chart is loading... It may take a bit of time. Please be patient and don't reload the page.

Share - Bookmark