LOGIN TO YOUR ACCOUNT

Username
Password
Remember Me
Or use your Academic/Social account:

CREATE AN ACCOUNT

Or use your Academic/Social account:

Congratulations!

You have just completed your registration at OpenAire.

Before you can login to the site, you will need to activate your account. An e-mail will be sent to you with the proper instructions.

Important!

Please note that this site is currently undergoing Beta testing.
Any new content you create is not guaranteed to be present to the final version of the site upon release.

Thank you for your patience,
OpenAire Dev Team.

Close This Message

CREATE AN ACCOUNT

Name:
Username:
Password:
Verify Password:
E-mail:
Verify E-mail:
*All Fields Are Required.
Please Verify You Are Human:
fbtwitterlinkedinvimeoflicker grey 14rssslideshare1

Refine by

Publication Year

2016 (73)
2017 (28)
2010 (14)
2011 (11)
2012 (2)
View more
Publication Year

2016 (73)
2017 (28)
2010 (14)
2011 (11)
2012 (2)
2013 (1)
2014 (1)
2015 (1)

Access Mode

Document Type

Article (131)
Unknown (15)

Document Language

English (124)
Indonesian (7)

Data Provider

  • 131 documents, page 1 of 14

    Cover & Preface - JOSI Vol. 16 (1) 2017

    Hilma Raimona Zadry (2017)

    Cover & Preface - JOSI Vol. 15 (2) 2016

    Zadry, Hilma Raimona (2016)

    cover, Preface

    Rukman, Hertadi; Shinichi, Miura; Rinovia, Simanjuntak; Karel, Svadlenka (2011)
    Paleontological works in Myanmar

    Algoritma Penentuan Ukuran Batch Integer pada Penjadwalan Flowshop Satu Mesin

    Hadigufri Triha; Ahmad Syafruddin Indrapriyatna; Jonrinaldi Jonrinaldi; Berry Yuliandra (2016)
    Scheduling is an important area of production planning and control. Scheduling is required to produce an existing job by allocating existing resources in the proper execution order. Production schedules arranged effectively and efficiently to maximize resources utility, minimize waiting and idle time and increase productivity. The flowshop batch scheduling model for one machine that takes inventory and quality cost into account has been developed by Indrapriyatna et al (2007a). However, the m...

    Pengurangan Bullwhip Effect dengan Metode Vendor Managed Inventory

    Fenny Rubbayanti Dewi; Annisa Kesy Garside (2016)
    Information distortion caused PT Multi Sarana Indotani got higher demand than the distributor. Demand variability in each echelon of the supply chain (bullwhip effect) may occur due to lack of demand stability that the producer had difficulty in determining the amount of production. One of the collaboration methods that can be applied to overcome the information distortion as causes of the bullwhip effect is vendor managed inventory, where the needs of distributor and retailers monitored and ...

    Meminimalisasi Nilai Error Peramalan dengan Algoritma Extreme Learning Machine

    Rachmad Hidayat; Suprapto Suprapto (2016)
    This study uses a machine learning algorithm which is the extreme model one of the new learning method of neural networks. Determining the value of forecasting based on actual value. Output generated more quickly in this process, because the learning done in a fast speed and better accuracy rate than conventional forecasting methods. Epoch using the parameter changes and changes in the range of accuracy of test results demonstrate the value of error is quite good during the system testing. ...

    Sistem Peringatan Dini untuk Mendeteksi Lifetime Sparepart pada Mesin TR OSAWA

    Adi Nugroho; Yahri Nastangin (2017)
    Maintenance is a very important activitiy to keep an equipment always at its best condition. This research aims to create an early warning system/ lifetime spare parts detector of Nissin Kogyo Batam (NKB) Company’s TR Osawa machine by adopting PLC (Programmable Logic Controller). PLC is used to automatically calculate the lifetime spare parts of TR Osawa machine. PLC will shut down the machine if it detects that lifetime spare parts have reached the specified setting standard (380-400 k pcs)....

    Model Lokasi-Alokasi Bantuan Logistik Catastrophic Berbasis Masjid di Kota Padang

    Nofa Ariyana (2016)
    Padang is one of the most vulnerable area of earthquake and tsunami in Indonesia. Therefore, it is necessary to have a good strategic planning about disaster logistics system and contingency planning. Contigency planning have three factors, human resources, transportation, and inventory. The problems that happened at distribution of disaster logistical buffer between distribution centre (BPBD Padang) and evacuation post are needed a buffer post (assistant post). This research suggest a locati...

    Perancangan Sistem Informasi pada Bagian Gudang PT. PN VI Unit Usaha Ophir

    Dina Rahmayanti; Ringgo Afrinando (2016)
    Sistem Informasi adalah sistem buatan manusia yang terdiri dari komponen-komponen dalam organisasi untuk dapat menyajikan informasi . Sebuah sistem informasi yang baik dapat meningkatkan kinerja dari semua kegiatan dalam perusahaan yang didukung oleh data yang akurat dan lebih aman , sehingga semua kegiatan dapat berjalan lebih efektif. PTPN 6 Satuan Usaha Ophir adalah salah satu perusahaan yang bekerja di industri manufaktur pengolahan minyak sawit . Salah satu bagian dari perusahaan ini yan...

    Pengukuran Beban Kerja Psikologis dan Fisiologis Pekerja di Industri Tekstil

    Prima Fithri; Windi Fitri Anisa (2017)
    The development of manufacturing industries are growing rapidly along with the progress of time and the increasing sophistication of technology today, one of which is a manufacturing company engaged in the textile field is PT Unitex Tbk Bogor. PT Unitex Tbk Bogor is a company that processes raw materials into semi-finished and finished materials such as cotton processing up into yarn or fabric. The production process costs physiological and psychological workload which could harm an operator ...