LOGIN TO YOUR ACCOUNT

Username
Password
Remember Me
Or use your Academic/Social account:

CREATE AN ACCOUNT

Or use your Academic/Social account:

Congratulations!

You have just completed your registration at OpenAire.

Before you can login to the site, you will need to activate your account. An e-mail will be sent to you with the proper instructions.

Important!

Please note that this site is currently undergoing Beta testing.
Any new content you create is not guaranteed to be present to the final version of the site upon release.

Thank you for your patience,
OpenAire Dev Team.

Close This Message

CREATE AN ACCOUNT

Name:
Username:
Password:
Verify Password:
E-mail:
Verify E-mail:
*All Fields Are Required.
Please Verify You Are Human:
fbtwitterlinkedinvimeoflicker grey 14rssslideshare1
Languages: English
Types: Unknown
Subjects: H300
  • The results below are discovered through our pilot algorithms. Let us know how we are doing!

    • ACEIT Family, Automated Cost Estimation Integrated Tools, 2007, Retrieved: 5th April 2007,
    • Ben-Arieh D, “Cost Estimation System for Machined Parts”, International Journal of Production Research, Vol. 38, 2000, pp 4481-4494.
    • Chougule RG and Ravi B, “Casting Cost Estimation in an Integrated Product and Process Design Environment”, International Journal of Computer Integrated Manufacturing, Vol. 19, No. 7, 2006, pp 676 - 688.
    • Cost Advantage, Cognition Corporation, 2007, Retrieved: 5th April 2007,
    • COSYSMO Costar, SoftStar Systems, 2007, Retrieved: 5th April 2007,
    • Curran R, Raghunathan S, Price M, “Review of Aerospace Engineering Cost Modelling: The Genetic Causal Approach”, Progress in Aerospace Sciences, Vol. 40, 2004, pp 487-534.
    • El-Haram MA, Marenjak S, Horner RMW, “Development of a Generic Framework for Collecting Whole Life Cost Data for the Building Industry”, Journal of Quality in Maintenance Engineering, Vol. 8, No. 2, 2002, pp 144-151.
    • Feldman P and Shtub A, “Model for Cost Estimation in a Finite-Capacity Environment”, International Journal of Production Research, Vol. 44, No. 2, 2006, pp 305- 327.
    • Filippazzo G, “Complexity Based Cost Estimating Relationships for Space Systems), Aerospace Conference Proceedings, IEEE, 2004.
    • Giachetti RE and Arango J, “A Design-centric Activitybased Cost Estimation Model for PCB Fabrication”, Concurrent Engineering: Research and Applications, Vol. 11, No. 2, 2003, pp. 139-149.
    • Ghiani G, Laporte G and Musmanno R, Introduction to Logistics Systems Planning and Control, Publisher John Wiley & Sons, Year of Publication: 2004, ISBN:0470849169.
    • Haberle KR and Graves RJ, “Cycle Time Estimation for Printed Circuit Board Assemblies”, IEEE Transactions on Electronics Packaging Manufacturing, Vol. 24, No. 3, 2001, pp.188-194.
    • Hale, J., Parrish, A, Dixon, B., Smith, R.K., “Enhancing the COCOMO Estimation Models, IEEE Software, Vol. 17, No. 6, 2000, pp.45-49.
    • Hooper MJ, Steeple D and Winters CN, “Costing customer value: an approach for the agile enterprise”, International Journal of Operations & Production Management, Vol. 21 No. 5/6, 2001, pp. 630-644.
    • Management, Vol. 19 No. 7, 1999, pp. 738-755.
    • Jiao J and Tseng MM, “Understanding Product Family for Mass Customization by Developing Commonality Indices”, Journal of Engineering Design, Vol. 11, No. 3, 2000, pp 225-243.
    • KAPES, PS Industry Holdings Inc., 2007, Retrieved: 5th April 2007, http://www.kapes.com
    • Kleyner A, Sandborn P. and Boyle J, “Minimization of Life Cycle Costs Through Optimization of the Validation Program - A Test Sample Size and Warranty Cost Approach”, Proceedings: International Symposium on Product Quality and Integrity, 2004, pp 553-558.
    • Koltai T, Lozano B, Guerrero B, and Onieva L, “A Flexible Costing System for Flexible Manufacturing Systems using Activity Based Costing”, International Journal of Production Research, 2000, Vol. 38, No. 7, pp. 1615- 1630.
    • Layer A, Ten Brinke E, Houten FV, Kals H and Haasis S, “Recent and Future Trends in Cost Estimation”, International Journal of Computer Integrated Manufacturing, Vol. 15, No. 6, 2002, pp. 499-510.
    • lccWare, Isograph Ltd, 2007, Retrieved: 5th April 2007, www.isograph-software.com/
    • Maropoulos PG, Bramall DG, Chapman P, Cheung WM, McKay KR and Rogers BC, “Digital Enterprise Technology in Production Networks”, International Journal of Advanced Manufacturing Technology, Vol. 30, No. 9-10, 2006, pp.911-916.
    • Mauchand M, Perry N and Bernard A, “Specification Management for the Cost Constraint Optimisation in Micro-electronic Design, International Journal of Manufacturing Technology and Management, 2006, ISSN (Online): 1741-5195 - ISSN (Print): 1368-2148.
    • Miraglia S, Blouin C, Boldman G, Judd S, Richardson T and Yao D, “ABC Modelling: Advanced Features”, Advanced Semiconductor Manufacturing Conference, IEEE, 2002, pp.336 - 339.
    • Nicolini D, Tomkins C, Holti R, Oldman A and Smalley M, “Can Target Costing and Whole Life Costing be Applied in the Construction Industry? Evidence from Two Case Studies”, British Journal of Management, Vol. 11, 2000, pp. 303-324.
    • Niazi A, Dai1 JS, Balabani S and Seneviratne L, “Product Cost Estimation: Technique Classification and Methodology Review”, Journal of Manufacturing Science and Engineering, No. 128, 2006, pp.565-575.
    • PRICE Modules, PRICE Systems, 2007, Retrieved: 5th April 2007,
    • Pulsar, Shore Software, Inc., Retrieved: 5th April 2007,
    • Relex LCC, RELEX Reliability Studio 6.0, Relex Software Corporation, Retrieved: 5th April 2007,
    • Roy R and Kerr C, “Cost Engineering: Why, What and How?” Decision Engineering Report Series, 2003, ISBN 1-861940-96-3.
    • Roy R, Kelvesjo S, Forsberg S and Rush C, “Quantitative and Qualitative Cost Estimating for Engineering Design”, Journal of Engineering Design, Vol.12 (2), 2001, pp. 147-162.
    • Sandberg M, Boart P and Larsson T, “Functional Product Life-cycle Simulation Model for Cost Estimation in Conceptual Design of Jet Engine Components”, Concurrent Engineering: Research and Applications, Vol. 13, No. 4, 2005, pp. 331-342.
    • Sandborn PA, Etienne B, Herrmann JW and Chincholkar MM, “Cost and Production Analysis for Substrates with Embedded Passives”, Circuit World, Vol. 30, No. 1, 2003, pp. 25-30, 2003
    • Scanlan J, Hill T, Marsh R, Bru C, Dunkley M and Cleevely P, “Cost Modelling for Aircraft Design Optimization, Journal of Engineering Design, Vol. 13, No. 3, 2002, pp. 261-269.
    • SEER Modules, Galorath Incorporated, 2007, Retrieved: 5th April 2007,
    • Ten-Brinke E, Lutters E, Streppel T and Kals H, “Variant-based Cost Estimation Based on Information Management” International Journal of Production Research, Vol. 38, No. 17, 2000,4467-4479.
    • Ten-Brinke E, Lutters E, Streppel T and Kals H, “Cost Estimation Architecture for Integrated Cost Control based on Information Management”, International Journal Computer Integrated Manufacturing, Vol. 17, No. 6, 2004, pp.534-545.
    • Thevenot HJ and Simpson T, “Commonality Indices for Product Family Design: a Detailed Comparison”, Journal of Engineering Design, Vol.17, No. 2, 2006, pp. 99-119.
    • Trichy T, Sandborn P, Raghavan R and Sahasrabudhe S, “A New Test/Diagnosis/Rework Model for Use in Technical Cost Modelling of Electronic Systems Assembly”, ITC International Test Conference, IEEE, 201, pp.1108-1117.
    • Ugwua OO, Kumaraswamya T, Kung MM, and Ng ST, “Object-Oriented Framework for Durability Assessment and Life Cycle Costing of Highway Bridges”, Automation in Construction, Vol.14, 2005, pp. 611- 632.
    • Vanguard System, Vanguard Software Corporation, Retrieved: 5th April 2007,
    • Watson P, Curran R, Murphy A and Cowan S, “Cost Estimation of Machined Parts within an Aerospace Supply Chain”, Concurrent Engineering: Research and Applications, Vol. 14, No. 1, 2006.
    • Yu WD and Lai CC, “WICE: A Web-based Intelligent Cost Estimator for Real-time Decision Support”, Proceedings of the IEEE/WIC International Conference on Web Intelligence, 2003, 0-7695-1932- 6/03.
  • No related research data.
  • No similar publications.

Share - Bookmark

Cite this article