LOGIN TO YOUR ACCOUNT

Username
Password
Remember Me
Or use your Academic/Social account:

CREATE AN ACCOUNT

Or use your Academic/Social account:

Congratulations!

You have just completed your registration at OpenAire.

Before you can login to the site, you will need to activate your account. An e-mail will be sent to you with the proper instructions.

Important!

Please note that this site is currently undergoing Beta testing.
Any new content you create is not guaranteed to be present to the final version of the site upon release.

Thank you for your patience,
OpenAire Dev Team.

Close This Message

CREATE AN ACCOUNT

Name:
Username:
Password:
Verify Password:
E-mail:
Verify E-mail:
*All Fields Are Required.
Please Verify You Are Human:
fbtwitterlinkedinvimeoflicker grey 14rssslideshare1
Khan, Sheriz; Tzortzopoulos, Patricia
Languages: English
Types: Unknown
Subjects: NA
Variability in workflow during the design stage of building projects has been widely acknowledged as a problem related to poor planning and control of design tasks and has been identified as a major cause of delay in building projects. The Last Planner system (LPS) of production planning and control helps to create predictable and reliable workflow by enabling the management of the range of relationships, interfaces and deliverables involved in a project. This paper presents results of implementing LPS in design to minimize variability in workflow within BIM-based building design projects. Action research was used to implement and evaluate the effectiveness of LPS weekly work planning (WWP) to improve workflow during the design development phase of two building design projects. The research was carried out with the collaboration between design practitioners at two building design firms in Florida and the researchers as facilitators. Overall PPC (Percent Plan Complete) measurements suggest that design workflow improved in both projects after WWP was implemented. However, efforts to use BIM in a lean way in the two projects (discussed in detail in an IGLC22 conference paper by the authors of this paper) were believed to be partly responsible for the improvement in design workflow.\ud KEYWORDS\ud Design workflow variability, LPS, BIM.
  • The results below are discovered through our pilot algorithms. Let us know how we are doing!

    • AlSehaimi, A., Tzortzopoulos, P. and Koskela, L., 2013. Improving Construction Management Practice with the Last Planner System: A Case Study. Engineering, Construction and Architectural Management, 21 (1), pp.51-64.
    • Ballard, G. and Howell, G., 1994. Implementing Lean Construction: Stabilizing the Work Flow. In: Proc. 2nd Ann. Conf. of the Int'l. Group for Lean Construction, Santiago, Chile, September 28-30.
    • Ballard, G., 1999. Improving Workflow Reliability. In: Proc. 7th Ann. Conf. of the Int'l. Group for Lean Construction, Berkeley, California, USA, July 26-28.
    • Bhatla, A. and Leite, F., 2012. Integration Framework of BIM with the Last Planner System. In: Proc. 20th Ann. Conf. of the Int'l. Group for Lean Construction, San Diego, California, USA, July 17-22.
    • Hamzeh, F., Ballard, G. and Tommelein, I., 2009. Is the Last Planner System Applicable to Design? A Case Study. In: Proc. 17th Ann. Conf. of the Int'l. Group for Lean Construction, Taipei, Taiwan, July 15-17.
    • Iivari, J. and Venable, J., 2009. Action Research and Design Science Research - Seemingly Similar but Decisively Dissimilar. In: Proc. 17th European Conference on Information Systems, Verona, Italy, June 8-10.
    • Koskela, L., Ballard, G. and Tanhuanpää, V., 1997. Towards Lean Design Management. In: Proc. 5th Ann. Conf. of the Int'l. Group for Lean Construction, Gold Coast, Australia, July 16-17.
    • Koskenvesa, A. and Koskela, L., 2012. Ten Years of Last Planner in Finland-Where Are We? In: Proc. 20th Ann. Conf. of the Int'l. Group for Lean Construction, San Diego, California, USA, July17-22.
    • O'Brien, R., 2001. An Overview of the Methodological Approach of Action Research. In: Roberto Richardson, Eds. Theory and Practice of Action Research, Universidade Federal da Paraíba, João Pessoa, Brazil.
    • Tiwari, S. and Sarathy, P., 2012. Pull Planning as a Mechanism to Deliver Constructible Design. In: Proc. 20th Ann. Conf. of the Int'l. Group for Lean Construction, San Diego, California, USA, July 17-22.
    • Wesz, J., Formoso, C. and Tzortzopoulos, P., 2013. Design Process Planning and Control: Last Planner System Adaptation. In: Proc. 21st Ann. Conf. of the Int'l. Group for Lean Construction, Fortaleza, Brazil, July 31- August 2.