LOGIN TO YOUR ACCOUNT

Username
Password
Remember Me
Or use your Academic/Social account:

CREATE AN ACCOUNT

Or use your Academic/Social account:

Congratulations!

You have just completed your registration at OpenAire.

Before you can login to the site, you will need to activate your account. An e-mail will be sent to you with the proper instructions.

Important!

Please note that this site is currently undergoing Beta testing.
Any new content you create is not guaranteed to be present to the final version of the site upon release.

Thank you for your patience,
OpenAire Dev Team.

Close This Message

CREATE AN ACCOUNT

Name:
Username:
Password:
Verify Password:
E-mail:
Verify E-mail:
*All Fields Are Required.
Please Verify You Are Human:
fbtwitterlinkedinvimeoflicker grey 14rssslideshare1
Publisher: Mathematical and Software Engineering
Journal: Mathematical and Software Engineering
Languages: English
Types: Article
Subjects: Optimal Site; Photovoltaic; Electric Power; Renewable Energy; PVSyst; Global Radiation On Horizontal Plane; Unit Cost of Energy; Site Suitability Factor; Suitability Ranking
In this paper, method selecting optimal location for large scale photovoltaic (PV) power plant in Imo State is carried out. Ten local government areas (LGAs) in Imo were selected out of the 27 LGAs in the state. Also, five parameters were used for ranking the selected LGAs for their suitability for large scale PV power plant. The five parameters are; (i) Global Irradiation On Horizontal Plane  (kWh/m²) (ii) Available Energy (Kwh) (iii) Yearly Unit Cost of Energy (iv) Population  (v) Land Mass (Km2). PVSyst software was used for the simulation of the PV energy generator output and unit cost at each of the selected LGA. The meteorological data used for the simulation was obtained from NASA website. Also, population density and land mass of each of the LGAs were obtained from Nigerian Population Commission publication. In all, Umuapu has the highest PV Site Suitability Factor (PVSSF) of 142 while Oguta has the least with 39. Consequently, the optimal site for large scaled PV power plant among the selected LGAs in Imo State is Umuapu. Accordingly, Umuapu has the PV Site Suitability Rank (PVSSR) of one (1) while Oguta has the poorest PVSSR value of 10.
  • No references.
  • No related research data.
  • No similar publications.

Share - Bookmark

Cite this article